Tenders floated for elevated corridor from Lighthouse to Thiru. Vi. Ka. Bridge
Highways Department calls for consultants to prepare a detailed project report. The corridor will run via Santhome High Road, Greenways Road, and Durgabai Deshmukh Road. It will have two lanes up to 1.8 km, and four lanes for the remaining stretch.
The project will take 2 years to complete
Read the full report on The Hindu
Story file
How this page works. The Headline Update lists this report from The Hindu with a short summary and a link to the original. The original reporting and photograph belong to the publisher. Spotted an error in our summary? Tell our corrections desk.

